Injection flow rate data - Vendenheim 2020 Stimulation
Description
Injection flow rate obtained during the operations of the 2020 hydraulic program at Vendenheim on the two wells GT1 and GT2 .
Several operations were carried out from 19/08/2020 to 02/01/2021, for more details see the expert report.
The data parameters are the following:
Column 1: Date (UTC)
Column 2: Time (UTC)
Column 3: Injection flow rate (m3/h)
These data have been extrapolated from the figures in the expert report.
This resource is available for download upon request.
This ressource is in following collection(s)
Associated ressources
|
Expert report
IsReferencedBy
Report
URL
|
Stakeholders
Creator(s)
Fonroche Géothermie
Rights Holder(s)
Fonroche Géothermie
Location
Temporal coverage
Aug. 19, 2020 to Jan. 2, 2021
Subjects
Keywords
How to cite
EOST & Fonroche Géothermie (2020). Episode: 2020 Stimulation Geoven geothermal project at Vendenheim. EOST-CDGP.
License
Except where otherwise noted, content for this ressource is licensed under a Creative Commons Attribution 4.0 International license.
Ressource last modified on June 10, 2026