VDH-GT1 well
Description
VDH-GT1 is the first well drilled within the framework of the Geoven geothermal project at Vendenheim. The drilling of the well began in June 2017 and reached a final length of 5408 m in March 2018. A second leg at VDH-GT1 was drilled between February and September 2019 and a third between June and August 2020 to 5447 m (4644m TVD).
VDH-GT1 will be used as production well.
Location of the VDH-GT1 wellhead (in WGS84):
Latitude: 48.66169796°
Longitude: 7.77349337°
Altitude: 134m
At the present time, the Geoven project is still in development and this description may change.
| Data request |
| More information |
This ressource is in following collection(s)
https://doi.org/10.25577/kkz6-fc66
Stakeholders
Rights Holder(s)
Fonroche Géothermie
Location
Temporal coverage
2018
Subjects
Keywords
How to cite
« Infoterre - Dossier du sous-sol - Fiche BSS002PVPS ». Consulted on September 30, 2020. http://ficheinfoterre.brgm.fr/InfoterreFiche/ficheBss.action?id=BSS002PVPS
License
Except where otherwise noted, content for this ressource is licensed under a Creative Commons Attribution 4.0 International license.
Ressource last modified on June 10, 2026