VDH-GT1 well

Description

VDH-GT1 is the first well drilled within the framework of the Geoven geothermal project at Vendenheim. The drilling of the well began in June 2017 and reached a final length of 5408 m in March 2018. A second leg at VDH-GT1 was drilled between February and September 2019 and a third between June and August 2020 to 5447 m (4644m TVD).
VDH-GT1 will be used as production well.

Location of the VDH-GT1 wellhead (in WGS84):
Latitude: 48.66169796°
Longitude: 7.77349337°
Altitude: 134m

At the present time, the Geoven project is still in development and this description may change.

Data request 
More information

 

This ressource is in following collection(s)

Episode: Geoven geothermal project at Vendenheim

https://doi.org/10.25577/kkz6-fc66

Stakeholders

Rights Holder(s)

Fonroche Géothermie


Location

Temporal coverage

2018

Subjects

Keywords

How to cite

« Infoterre - Dossier du sous-sol - Fiche BSS002PVPS ». Consulted on September 30, 2020. http://ficheinfoterre.brgm.fr/InfoterreFiche/ficheBss.action?id=BSS002PVPS

License

Except where otherwise noted, content for this ressource is licensed under a Creative Commons Attribution 4.0 International license.

Ressource last modified on June 10, 2026