VDH-GT1 well

Description

VDH-GT1 is the first well drilled within the framework of the Geoven geothermal project at Vendenheim. The drilling of the well began in June 2017 and reached a final length of 5408 m in March 2018. A second leg at VDH-GT1 was drilled between February and September 2019 and a third between June and August 2020 to 5447 m (4644m TVD).
VDH-GT1 will be used as production well.

Location of the VDH-GT1 wellhead (in WGS84):
Latitude: 48.66169796°
Longitude: 7.77349337°
Altitude: 134m

At the present time, the Geoven project is still in development and this description may change.

Data request 
More information

 

Stakeholders

Rights Holder(s)

Fonroche Géothermie


Location

Temporal coverage

2018

Subjects

Keywords

How to cite

« Infoterre - Dossier du sous-sol - Fiche BSS002PVPS ». Consulted on September 30, 2020. http://ficheinfoterre.brgm.fr/InfoterreFiche/ficheBss.action?id=BSS002PVPS

License

Except where otherwise noted, content for this ressource is licensed under a Creative Commons Attribution 4.0 International license.

Ressource last modified on June 10, 2026